Skip to content

Search results

Searched for "4". Found 259 results in 6 milliseconds.

Displaying results 141 to 150 of 259.

John Worth Shopfitters invests in HOMAG CENTATEQ N-500 CNC

synchronised digital servo-drives in the X-direction to guarantee the highest processing quality; a 13.4 HP HSK routing spindle; a highly flexible matrix table with grid grooves for clamping of templates or

Popp GmbH & Co. KG: Storage system and saw deal with normal panel

either. The air cushion table in front of the right-angled fence is extended forwards by approximately 4 m. Behind this are lifting tables for the individual stacks. The top panel is automatically always a

Order intake in the first half of 2022 exceeds EUR 1 billion for the first time

Positive business development at HOMAG Group continues Schopfloch, August 4, 2022. Following the record order intake in the opening quarter, the strong demand at the HOMAG Group continued in the second

Double capacity with HOMAG's DRILLTEQ V-310

a demonstration of HOMAG’s machinery and software, please contact HOMAG UK on 01332 856500, option 4 for the sales department. Or email info-uk@homag.com .

Hugh Stirling expands fire door manufacturing with HOMAG

a demonstration of HOMAG’s machinery and software, please contact HOMAG UK on 01332 856500, option 4 for the sales department. Or email info-uk@homag.com.

State-of-the-art automation

r components on an old furniture production site in Dessau, in accordance with aspects of Industry 4.0. Goldbach Kirchner raumconcepte GmbH is an innovative, owner-managed family company which is now run [...] probably one of the most modern systems in the world. In principle, it is the embodiment of the Industry 4.0 concept. That's why we want to connect even more suppliers. At the moment, only one timber material

Goldbach Kirchner: One of the most up-to-date Industry 4.0 plants

One manufacturing execution system, 12 new machines, 1,500 square meters of space. All combined to create a fully networked, highly flexible batch size 1 furniture production for Goldbach Kirchner’s i

Furniture ordered online - delivered in 48 hours: Industry 4.0 at

An article from the specialist magazine DDS, 11/ 2016. Here you can read the article on DDS-Online. If a customer is missing a hinge or a panel, the order could mean money down the drain rather than a

Taking Industry 4.0 to the next level: Accelerating digitalisation in the Asian market

“The woodworking industry in Asia is facing unprecedented challenges as they cope with escalating business costs, fast-changing customer demands and competitive pressures stemming from digital transfo

INDIAWOOD 2022: Hall 4 | All from one source | HOMAG India

We are looking ahead forward: Among other things, HOMAG India will be presenting solutions for edge banding, panel dividing and CNC-operating. Visitors will also get to know how they can use digital a

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.