Skip to content

Search results

Searched for "M". Found 259 results in 11 milliseconds.

Displaying results 101 to 110 of 259.

Familiar, but contemporary

evident from the increased productivity: "While we used to produce around 25 m2 of elements each day, today we are producing almost 50 m2," explains Benjamin Stocksiefen. "So, we have almost doubled our capacity [...] Considering a quantity of 20 houses per year, Benjamin and Heiner Stocksiefen opted for the WALLTEQ M-120 multifunction bridge from WEINMANN: a multifunction bridge that, alongside low investment costs

Custom-made flexible workflow

invested in an automated three-table system from WEINMANN that was equipped with a WALLTEQ M-380 and a WALLTEQ M-300 insuFill. The system was put into operation in August of the same year. Florian Hegar [...] as a vapor barrier, but in future, this level will consist of an AGEPAN panel into which the WALLTEQ M-380 will cut the cable channels. The walls will then leave the hall completely sealed, including the

Customer Magazine performance – issue 15 | 2016

prefabrication allwos for top-quality timber frame construction - CCG Ltd. Speed and precision over 60 m and beyond - Stephan Holzbau GmbH News Better quality and cost efficiency with nesting The compact line

A smart factory for Yamato Scientific.

Prefecture, the new factory sprawls over an impressive site area of 11,996.66 m 2 , with a total floor area of 3,408.70 m 2 . The vision for this facility was not only to double the production capacity

2 birds with one stone — cutting and element production in one machine

large surface processing." The 55-cm diameter saw blade required for cutting solid wood and the 2.5-m-by-5-m vacuum table guarantee that work is so much easier . The accuracy in cutting and joining has also

Hazlin of Ludlow improves manufacturing efficiencies with HOMAG

handle the various door sizes we produce. “The new S-800 runs at 18 m/min compared with the old machine which could only produce 10 m/min. What’s more, we are able to achieve this with just two operators

The world's wooden skyscrapers

supplied and assembled the timber frame construction for this project, which has a wall area of 3097 m², a larch facade with a gray varnish, 266 wooden windows, 4 doors and 2 emergency exit windows. All [...] with four residential floors features a wooden hybrid construction and houses 144 apartments over 8200 m². The four wooden floors were constructed from prefabricated surface elements over a working period

World of brand experiences around the world

production. It starts in the Dula plants with a quantity of nine identical workpieces. On approx. 19,000 m² (approx. 20,000 ft²) production surface about 10 employees with several CNC-machines from HOMAG and

Simple steps to digitalization – with a sense of proportion

private customers." "I'm certainly no PC freak" We spoke about how his business has entered the world of digitalization. The friendly master joiner admits to me quite openly, "I'm certainly no PC freak [...] Strom produces furniture and interior fittings. On site, I discover the usual standard machines. I'm curious about what to expect, as the reason for my visit to the workshop is one that you wouldn't normally

Erheblich höhere Wertschöpfung

company moved to new premises in Ochtendung, which offered better transport connections and with 10000 m2 of space, better growth opportunities. Dieter Schuth and his daughter Cheyenne who will later continue [...] more interesting." Dieter and Cheyenne Schuth therefore ordered two processing tables and a WALLTEQ M-380 multifunction bridge in Lonsingen, where they were also supported in applying for grants for the [...] our target times. For example, when constructing a new hotel, we had an element output of almost 100 m2 with only two employees working in production. Today, automation also enables us to quickly respond

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.