Skip to content

Search results

Wood frame construction — automated and customized production

for wood work The operating premises of Holzbindervoss cover 35,000 m², with wood frame construction taking up a production area of 1000 m². Based on sales, the nail plate truss area is the largest area, [...] market position and experience that WEINMANN has in Germany." The compact system consists of one WALLTEQ M-380 multifunction bridge and two BUILDTEQ A-550 assembly tables. This enables Holzbindervoss to produce

Automatic measurement and readjustment in autopilot mode

takes place at a speed of up to 300 m/min. Before the workflow continues with the packaging process, the panels are profiled at the top ends at a speed of up to 80 m/min. In the final step, the panels are [...] longitudinal rip saw divides the panels into strips. This processing takes place at a speed of up to 110 m/min. All processing units in the rip saw are equipped with servo axes and can be adjusted automatically

HOMAG

Betriebstechnik (m/w/d) 2026 HOMAG GmbH Schopfloch, Germany Ausbildung Fachkraft für Lagerlogistik (m/w/d) 2026 HOMAG GmbH Gengenbach, Germany Ausbildung Fachkraft für Metalltechnik - Montagetechnik (m/w/d) 2026

Vertical CNC Processing Center DRILLTEQ V-200

A flexible all-rounder for processing in just 5 m² These versatile machines can be used for drilling, trimming and grooving, offering the ideal solution to save you time, space, energy and money. They

Executive & Supervisory Board

Betriebstechnik (m/w/d) 2026 HOMAG GmbH Schopfloch, Germany Ausbildung Fachkraft für Lagerlogistik (m/w/d) 2026 HOMAG GmbH Gengenbach, Germany Ausbildung Fachkraft für Metalltechnik - Montagetechnik (m/w/d) 2026 [...] Dietmar Heinrich, Marbach, Germany Member of the board of Dürr AG, Stuttgart Dr. Steffen Lorscheider, LL.M., Selm, Germany Lawyer and notary public; partner in the law firm Spieker & Jaeger, Dortmund Dr. Anja

MOD21 – Making modular construction efficient

childcare project in the region. The structure, a timber modular building, measures 35.5 m x 18.1 m and stands 7.5 m tall. “Construction lasted from January to June 2024,” explains Zec. “We prefabricated [...] Johann. “It was a complete success” Today, Wittum 1 offers children a generous gross floor area of 810 m² across two levels. The center provides space for three groups, accommodating children both under and [...] political support. A major milestone was the adoption of the new Model Timber Construction Guideline (M-HolzBauRL) in September 2024, which now needs to be integrated into the building codes of Germany’s

A small quantum leap

the ability to produce very heavy elements weighing up to 3.5 t with dimensions of up to 3.70 m x 12.00 m. The custom hall layout, the planning of the workflow, the proven distribution trolley and the [...] houses the new production line for timber frame elements, at the heart of which is a WEINMANN WALLTEQ M-380 insuFill multifunction bridge with an integrated blowing plate and two work tables. The blowing [...] the module station. Here, a crane picks up the timber frame elements and transports them to the 100 m long module rail system in the left-hand bay of the hall. It is here that the modules are assembled

Moulder Kentwood M-100

perfect entry into 4-sided moulding and planning, offering advanced features in a compact footprint. The M-100 is the perfect entry into solid wood processing. This moulder is an efficient machine that combines

Edge banding machines EDGETEQ D-810 powerLine: Maximum Power

10 powerLine series format, profile and edge your furniture workpieces at feed speeds of up to 100 m/min. These high-performance machines are ideal for producing medium to large series. In addition, the

Lots of personal encounters in the trade fair month of July

from machines to software and services. A live demonstration was the multi-function bridge WALLTeq M-380 in combination with a carpentry table. The software partner granIT displayed the possibilities offered [...] Consulting were also available for meetings. The letters "P" for partnership, "I" for investment and "M" for the German word " Mitarbeitende " (employees) were particularly emphasised in the new stand design

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.