Skip to content

Search results

Searched for "3 lines of compliance". Found 274 results in 12 milliseconds.

Displaying results 51 to 60 of 274.

25 Years of HOMAG Window Production Solutions - Concepts for automated production since 1999

Windows and glass doors form a dividing line from the outside to the inside of a building. They perform a range of functions which, in addition to ventilation and passage, can be summarized as heat, cold [...] production of individual window parts, in this case in particular for wood-aluminum windows, was a profiLine BOF 311/40/PM. A machine length of 4.80 m provided the basis for clamping several pairs together. [...] time for this machining could be used by the operator for other value-adding activities. The profiLine BOF 311/40/PM in 1999 was therefore the first complete CNC window production center. The first po

Edge banding machines — new equipment variants ensure even greater flexibility and efficiency

S-240 (from model 1240 FC), EDGETEQ S-300, EDGETEQ S-380 | S-380 profiLine and, from October, also for EDGETEQ S-500 | S-500 profiLine series. Dimensionally accurate workpieces for discerning customers: [...] A high degree of reliability is ensured in programming thanks to the graphical representation with 3D workpiece simulation and the testing for permissible parameter combinations. The customizable user

Robots in production — a new trend?

panels for the manual lines, the openings for sockets, switches, etc. are also prepared in the panel processing center. Despite the flexibility of the main line, these auxiliary lines operate in parallel [...] of glue or plaster. Elements are produced on three lines At Bien-Zenker, insulation is currently inserted manually. This takes place on a production line that encompasses five work and turning tables and [...] load peaks on the main line and to produce knee walls which cannot run via the frame work station due to their low height (≤100 cm). After the second sheathing on the main line, the individual elements

CNC Machining Centers

Universal CNC technology with 3, 4 or 5 axes Stable moving gantry design Watchlist Details CNC Machining Centers CNC Processing Center CENTATEQ P-110 Universal CNC technology with 3, 4 or 5 axes Completely free [...] take on nesting processing. 3- and 4-axis machining Watchlist Details CNC Machining Centers CNC Gantry-Processing Center CENTATEQ N-500 Compact class Flexible handling concepts 3-, 4-axis machining Watchlist [...] flexibility, maximum efficiency 3, 4 or 5-axis processing Z-height up to 260 mm Watchlist Details CNC Machining Centers CNC-Gantry Processing Center CENTATEQ N-600 Nesting with 3-, 4- or 5-axis technology Watchlist

Index Living Mall creates concepts for living spaces

Solutions from HOMAG help to make this performance possible. A new production line, in operation since 2019, together with the Configurator3D software solution and the production control system, paved the way for [...] be manual and time-consuming is now carried out with automatic precision. At the beginning of the line, a storage system takes care of the panel organization. This is where the material is stored, sorted [...] stacks are transported for edging, where two edge banding machines that have been set up as a tandem line take on the processing. Once the components are finished, they move on to CNC processing. Here, c

HOMAG Treff 2024: Where sawdust flies and inspiration lands

live and in action. For this purpose, individual machines as well as complete production lines and production lines are set up in the factory halls in Schopfloch and Holzbronn. The numerous machine and software [...] inserting machine, which is the latest addition to the HOMAG line-up. It is the new entry-level machine for horizontal drilling and dowels with up to 3 individually retrievable drilling spindles and a maximum [...] to large series with high performance and low retooling. High-performance solution: U-line 4x EDGETEQ S-800 The U-line with four EDGETEQ S-800 edge banding machines allows you to produce both in series operation

Custom-made flexible workflow

prepared the automation of its element production so well that the commissioning of the new production line was practically just a formality. Founded in 1995 by Bernhard Hegar, Holzhaus Bonndorf GmbH immediately [...] full stories had been constructed. However, Florian Hegar sees his main business in building class 3, which is currently enjoying particularly high demand. In addition to single-family house construction [...] we merely co-moderated this process; ultimately, it was the employees who decided which production line was put in the hall." For the junior managing director this was an important success factor: "If you

Networked production in joineries

Today, at the start of the process chain, there is a HOLZMA series 3 panel dividing saw. Daxenberger purchased the HPP 300 profiLine model "because we had already had good experience with the predecessor [...] gives us more space and shorter distances to cover," explains Bernhard Daxenberger. The production line starts with cutting: panel material to the left and solid wood to the right. This is followed by the [...] part return and requires only one machine operator. Positioned directly afterwards is a BOF 311 profiLine CNC-controlled processing center, which is the second machine of this type at Daxenberger and which

HOMAG UK

Tables Framing Station Multifunction Bridge Handling and storage systems Timber Frame Production Lines Robotics Automation Robotics Return Conveyors Feed and stacking systems Case Clamps Packaging Machinery [...] Русский Dansk eShop Contact ContactFinder ServiceFinder Our Locations HOMAG Deutschland Homagstrasse 3 - 5 72296 Schopfloch Deutschland +49 5245 92 200 (DE) info@homag.com www.homag.com Directions What are [...] are here to help you achieve a high level of performance and quality with the HOMAG machines and lines. Providing you with the individual solution you require for your unique needs is our goal. Woodworking

HOMAG Group gets off to a good start in 2015

EUR million Q1 2015 Q1 2014 Order intake* 287.2 260.0 Order backlog* 354.1 294.0 Sales revenue 254.3 204.8 EBITDA** 22.6 15.0 Net profit for the period (after non-controlling interests) 4.1 2.5 * New [...] for cabinet makers increased its sales revenue in the first quarter of 2015 by 24 percent to EUR 254.3 million (prior year: EUR 204.8 million). Order intake at the Dürr Group affiliate increased by a good [...] is demonstrating live in action a fully linked and fully automated networked furniture production line stretching more than 100 meters. Yet again, the HOMAG Group is thereby setting standards in the w

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.