Skip to content

Search results

Searched for "4". Found 247 results in 16 milliseconds.

Displaying results 211 to 220 of 247.

25 Years of HOMAG Window Production Solutions - Concepts for automated production since 1999

this case in particular for wood-aluminum windows, was a profiLine BOF 311/40/PM. A machine length of 4.80 m provided the basis for clamping several pairs together. It could already boast a very high degree

Courage brings its own reward

in the inbox at midday, and the finished product to be on its way out of our dispatch department by 4.00 p.m. During this period, we are able to produce up to 20 parts per order. On average, our delivery

Wood work is on the up

table 3, where it is sheathed before undergoing final processing by the multifunction bridge. On table 4, the elements are then erected and distributed to a wall slot system. The outermost track on the left-hand

MOD21 – Making modular construction efficient

worktable, a multifunction bridge that processes both the top and bottom surfaces of elements up to 4.2 meters wide. At the end of this line, a crane lifts the finished floor panels and moves them to the

All or nothing - Restructuring results in more flexib

a turning operation. Here, the insulation is introduced before the element is transported to table 4 via a longitudinal conveyor. This table can be moved in the crosswise direction. On this table the second

HOMAG Canada

Toronto Showroom | 5090 Edwards Blvd. | L5T 2W3 Mississauga Montreal Showroom | 160 Rue Brunet | J3G 4S6 Mont. St. Hilaire Vancouver Showroom | 20285 Stewart Crescent unit #406 | V2X 8G1 Maple Ridge, BC

Robots in production — a new trend?

mature and proven systems; on the other hand, it means that the level of investment is manageable. 4. One factor that has a positive effect on the acceptance of the new systems is that the "robot colleague"

Automated storage nesting cell for motorhome production

over 600." Since 2011, MORELO has been part of the Knaus Tabbert Group, which generated sales of 1.4 billion euro last year. MORELO contributed 160 million euro to this figure. MORELO believes that the

Step by step to the right software

in part or through external third-party providers. Then the tender goes into the next phase. Step 4: Evaluation of the providers Together with the client, the completed specifications are evaluated. Those

Element construction

construction panels in your production hall regardless of weather conditions. You can implement Industry 4.0 in your production today using our digitally networked solutions. Our end-to-end solution concepts

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.