Skip to content

Search results

Searched for "M". Found 428 results in 8 milliseconds.

Displaying results 201 to 210 of 428.

Being faster — A key to success for Burger Küchen

ich we had planned one year in advance—on the very day it was scheduled; it really was textbook. I'm currently really very happy with how the unit costs have developed — that's what shows us whether we've

Schreinerei Kilian Fuchs: Wenn aus Ein-Mann ein Team wird

team—and the equipment—are decisive for a company's success." Making progress and getting bigger. "I'm never completely satisfied, and that's what drives me forward," says Fuchs. And further development

Produktivität verdoppelt: Spanische Schreinerei setzt IMOS ein

for our operators, precision and clarity for the customer and high productivity for the company". "I'm amazed at the things they do with the programme," concludes Ricardo Adam, Ricard's father and a lover

Process steps "shortened"

through the production line, the components pass through further new developments, such as a WALLTEQ M-300 insuFILL with a cleaning mechanism that ensures a clean contact surface of the insulating plate [...] required for large-scale projects. B&O Bau currently states the production capacity of its plant at 25,000 m2/a, but with one-shift operation and cycle times of 40 minutes for a two-layer element and around 20 [...] possible and a second shift to be probable in the foreseeable future, sees potential for up to 200,000 m2/a under full load in the plant. We can assume that the quantities in Frankfurt (Oder) will increase

Modernization

Manager Dürr Group Services Sp. z o.o. Schopfloch, Germany Ausbildung Elektroniker für Betriebstechnik (m/w/d) 2026 HOMAG GmbH All Jobs Machine Finder Step by step to the machine you are searching for... Open [...] operation Details Edge banding machines EDGETEQ S-500 Optimat and profiLine Feed rate: 16–20, 25, 30, 35 m/min Process PUR, EVA and airTec or laserTec using just one machine Minimum workpiece width: 60 mm (40 [...] Maximum cabinet processing. Minimum space requirements. A space-saving miracle that requires just 11 m² of floor space. Details Service Solutions ServiceBoard Easy machine service Rapid creation of service

Madergia — the Spanish timber construction industry is on the up

in the years ahead. In 2022, it decided to modernize production, having already integrated a WALLTEQ M-380 multifunction bridge as an initial step. “Right now, trends in Europe are moving from north to south [...] brand-new processing capabilities at its disposal in the new facility, which spans approximately 10,000 m2—enabling the development of even higher-value products for the market. “With WEINMANN, we’ve found

Internal growth

. Instead, it relies on higher quality compared to competitors: "Therefore, we're perhaps EUR 0.20/m more expensive, but we offer our customers services that a competitor cannot provide or charges extra [...] to 98 percent. To minimize the time lost when changing tools, the carpenter generally works with 13-m lengths of unprocessed material: "So if we need three components that are each four meters in length

Modular Constructions

Manager Dürr Group Services Sp. z o.o. Schopfloch, Germany Ausbildung Elektroniker für Betriebstechnik (m/w/d) 2026 HOMAG GmbH All Jobs Machine Finder Step by step to the machine you are searching for... Open [...] Privacy Policy Smartprefab for highest automation: FEEDBOT W-500 With the FEEDBOT W-500 and the WALLTEQ M-300 multifunction bridge, panels can be automatically applied and fixed to the element. Please confirm

Prefabricated Houses

Manager Dürr Group Services Sp. z o.o. Schopfloch, Germany Ausbildung Elektroniker für Betriebstechnik (m/w/d) 2026 HOMAG GmbH All Jobs Machine Finder Step by step to the machine you are searching for... Open [...] Privacy Policy Smartprefab for highest automation: FEEDBOT W-500 With the FEEDBOT W-500 and the WALLTEQ M-300 multifunction bridge, panels can be automatically applied and fixed to the element. Please confirm

Building living spaces

Schopfloch, Germany Ausbildung Elektroniker für Betriebstechnik (m/w/d) 2026 HOMAG GmbH Schopfloch, Germany Ausbildung Fachkraft für Lagerlogistik (m/w/d) 2026 HOMAG GmbH All Jobs Machine Finder Step by step

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.