Skip to content

Search results

Searched for "4". Found 240 results in 15 milliseconds.

Displaying results 191 to 200 of 240.

Unleash the full potential of production — application-related production optimization from the WEINMANN Academy

clearly and comprehensibly. If all information about a wall element is only implemented in a small A4 plan, colleagues in production often have no chance of determining the relevant layer and which details

Planing Moulding Profiling

Profiling Moulder Kentwood M200 Available with manual or CNC set-up. Independently driven spindles. 4-8 spindle configurations. Watchlist Details Moulding & Profiling Moulder Kentwood M300 24” touchscreen

Open heart surgery

that was faster than the previous one. His requirement was that the system should be able to cut up to 4,000 parts per day, complete with formatting, edging and drilling or trimming. At full capacity, this

How-To & Tips

Google. Activate YouTube » Privacy Policy Optimization software for cutting processes on saws Episode 4: Digital Insight with intelliDivide Cutting – Working with templates Please confirm that when you use

Where skilled workers are forged

central point with a "DRIVE5CS" spindle, which—with liquid cooling—provides 12 kW of power. The "V12/H4X2Y" drilling gear of the CENTATEQ works with 18 spindles, 12 of them in the vertical direction, four

Customized and versatile

of the production facility began in November 2018 and production started in Kaiserslautern on April 4, 2019. Today, 15 employees work at the new site over a production area of 4500 m² and an office space

HOMAG Treff 2024 – a great success!

y. This is ensured by 3 individually retrievable drilling spindles and a space allocation of up to 4 workpieces. Practical: With the CNC programming software woodWOP 8.1, the height and depth of the drilling

„Saudisierung“ führt zur Automatisierungswelle in der Möbelindust

present time in Saudi Arabia. The state subsidises projects that fall under the heading of "Industry 4.0" with up to 75% from various funding sources. So the cooperation between Al Joaib and Schuler Consulting

Erheblich höhere Wertschöpfung

time. "We wanted to make a difference on the market and, for example, also tap into building classes 4 and 5." New hall, new technology It was clear to the master carpenter that this could only be achieved

Step by step to success

optimization of the workflow: "We are certified for the construction of components for building class 4 and therefore we build a lot of fire barriers," explains Heiko Pape: "With these barriers, we lay the

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.