Skip to content

Search results

Searched for "transport". Found 190 results in 11 milliseconds.

Displaying results 91 to 100 of 190.

A flexible service provider for timber construction

paneled on one side are manufactured on two tables simul-taneously. If turning is required, the transport from table to table takes place with the aid of the hall crane. Looking back on the experience of [...] admittedly possible to create longer elements on the production line, however, "this would make transport and assembly unnecessarily complicated." Timber frames are clamped on the Weinmann system from a

A small quantum leap

facades and a work table for special elements complete the production line. A distribution trolley transports finished elements on to facade construction, window installation, interim storage, the loading [...] loading station and the module station. Here, a crane picks up the timber frame elements and transports them to the 100 m long module rail system in the left-hand bay of the hall. It is here that the modules

Edgebanders and Edge banding machines

workpieces to large, heavy workpieces—can be transported. Even sensitive surfaces such as those with an aluminum or stainless steel look can be transported without any problems. The ergonomics provide [...] the edge banding machine, or ejected from the process. Furniture parts with finished edging are transported out or can be stacked. Workpiece returns and edge banding machines from HOMAG are perfectly aligned

Quickly built

and doors are installed and the finishing work is complete. In the final step, the elements are transported to the wall storage before they are loaded. The prefabricated elements are assembled on the co

Assembly technology for the future

robot, so that sides, shelves, traverse bars, centre posts, rear panels, etc. only need to be transported to the machine. Everything else can be moved by robots without the extremely product-specific use

Step into the automated future

bridge the path from one machine to the other, AGVs are more flexible and individual in their transportation ways. Automate the whole process line is not common yet but may be standard soon. Therefore,

From the felled tree to the finished house

sheathing closes the wall. After a short finishing process, the wall is automatically erected and then transported to the intermediate storage. The carpenters in the factory assemble walls, ceilings and floors

Industrial manufacturing for personal bathroom furniture

decoupling buffer, and arefed to an EDGETEQ S-800 edge processing machine as required via intermediate transport. Designed for commissioned production, the machine works independently of width and can therefore

Versatile, flexible, smart – essential requirements for robot saws for woodworking shops!

disk wheel shredder through a waste flap and shredded there. For example, the system automatically transports the waste to a waste container. What's even smarter is that HOMAG offers the MachineBoard app in

Faster, better, more ergonomic

semi-automatic multifunction bridge works on two BUILDTEQ A-530 tilt tables, and wall elements are transported between the tables using the overhead crane. This cost-effective entry-level solution was tailored

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.