Skip to content

Search results

Searched for "-116 12=". Found 136 results in 12 milliseconds.

Displaying results 81 to 90 of 136.

Retail Furniture - HOMAG Automation TLF 211 storage system

process. “Since it was commissioned in March 2016, it’s been a revelation. Before, with two guys on 12 hour shifts, we were struggling to keep up with our beam sawing capacity; now, we’ve got one guy on

HOMAG Group continues on successful course with a strong second quarter of 2014

US, China and Poland. First six months of 2014 The HOMAG Group’s order intake improved by more than 12 percent to EUR 443.8 million in the first half of the year according to the new calculation method

HOMAG Japan

機械郡は、単なる製造ではなく、モノづくりに付加価値を求める匠たちの高度な要求に確実にお応えします。 国内拠点 ホマッグジャパン本社 〒541-0053 大阪市中央区本町4-3-9 本町サンケイビル 12F TEL: 050-3459-5070 | FAX: 06-6926-8170 関東オフィス + ショールーム 〒379-2302 群馬県太田市山之神町264-4 TEL: 050-2018-7886

CNC proves to be a game-changer for timber window manufacturer

to Phil Pitchford, HOMAG’s CNC expert, our ‘must haves’ for the machine: it had to last us at least 12 to 15 years, so the build quality had to be first class; it had to have high levels of repeatable accuracy

Customer back to full capacity thanks to HOMAG CENTATEQ P-110

efficiency – and precision – than ever before. We expect the machine to pay for itself in as little as 1-2 years.” More than a machine “The service is fantastic,” praises Simon Downing, Maintenance and Development

Sylmar Technology selects HOMAG SANDTEQ W-300 wide belt sander

correct sanding pressure. For increased accuracy, the mps® segmented pad system uses a super sensitive 12.5 mm grid for workpiece detection; this very fine detection, coupled with HOMAG’s rapid and frictionless

Investment in the future

undertakes practically all of the beam processing tasks within the company, which currently has a team of 12 employees. Cost-effective and flexible Why choose this solution? "We decided on the WBS 140 because

Nordhus focuses on multi-story modular construction

the final handover, it took only eight months. The prior planning phase, which extended over almost 12 months, was the most time-consuming block. Performance: What does your production sequence look like

Sven Christiansen invests in new edgebanding and CNC solutions

set up for each different sized panel. “The model we chose has an edge tape magazine that holds up to 12 different tapes which are automatically changed as required. The KAL 370 also has the airTec glueless

Perfect fit for the size of the company

staff, we can increase the quantity to one house per week — producing 52 houses per year plus around 12 house renovations. From that perspective, the company is in the best shape possible for my son." Photos:

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.