Skip to content

Search results

Searched for "-K6597*.BJHU7,0". Found 1268 results in 20 milliseconds.

Displaying results 651 to 660 of 1268.

A practical test mastered: productionManager proves

A paperless, transparent production: This was the goal of the carpentry company Binsch from Baden-Württemberg. Thanks to the high degree of digitization of the joinery, it was obvious to master this c

Pilot project for future growth

For the carpentry business, this is just the first step. Founded in 1978 in Bahlingen am Kaiserstuhl, Kreutner & Schmälzlin Holzbau GmbH currently covers a range of business areas: the company constru

Modular construction of temporary and permanent buildings

Not just temporary Known for its numerous innovative ideas in the timber construction industry, Swiss-based Blumer-Lehmann AG is also one of the pioneers of modular timber construction. Today, even de

A HOMAG storage system for the Plastics Industry

The logic of individual production processes requires high problem-solving expertise by a professional supplier. Optimum process operations, saving of production costs and flexibility in order process

Pioneers in their own countries - Timber construction in Estonia + USA

Timber construction in Estonia and the United States It is hard to imagine two countries in which the role of the timber construction diverges further than in Estonia and the United States. In Estonia

Flexibility was key

The automated assembly line, which he ordered from WEINMANN last year, had to be extremely versatile. He discovered just how versatile the assembly line was when it prefabricated free-formed pieces —

More than 650 HOMAG storage systems installed all over the world in 10

Panel dividing as beginning of the process chain is more and more focused in efficiency considerations. Here, the magic word is automation by storage systems. Time saving, transparency and cost contro

DÉMOS Korpuszentrum: Investition für effiziente Produktion

The new furniture parts center in the Martinov industrial park in Ostrava pushes the DÉMOS portfolio forward again = it enables customers to order an almost finished product – a kit of parts ready for

With modern manufacturing and construction to success

“Modernise or Die”, according to a landmark report by UK prefabrication visionary, Mark Farmer, but how? Peter Ward of Drouin West Timber and Truss (DWTT) was all too aware of Darwin’s immortal ‘adapt

Modular system allows for customized solutions

After a slump in the last two decades, an economic upturn in the Czech Republic has resulted in a construction boom, with many new apartments, offices and commercial buildings now being built. One dem

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.