Schreinerei Zeit: "We live and breathe carpentry!"

A lot of the work processes have also changed. The journeyman normally accompanies an order from cutting, through edging and CNC, right up to assembly. But what about when time is of the essence? "We can

Fully automated handling increases productivity

from the stack of raw material by the feeding portal and then fed to the carpentry machine. After cutting and beam processing, the processed timbers are discharged fully automatically, collected and destacked

WEINMANN solutions for timber construction

cell. The robot and multifunction bridge operate in parallel. The robot removes both full-format and cut panels from the unprocessed material stack fully automatically, aligns them, deposits them with a high

Edge banding machines — new equipment variants ensure even greater flexibility and efficiency

the workpieces safely below the top roll pressure unit. The moving gantry ensures precise parallel cuts — a prerequisite for achieving correct angles. This means that even rough-edged workpieces can be

Business figures for the first nine months of 2024: Slight increase in order intake at low level

decreased to 6,875 as of September 30, 2024 (09/30/2023: 7,482 employees). In addition to the job cuts, a reclassification effect must also be taken into account, as around 120 employees of a Polish service

Well-positioned – Syndikat Zimmerei AG

production capacity, but also result in cost savings. This is especially the case if additional cost-cutting potential can be used in work preparation via serial effects, for example, in the semi-detached houses [...] is still space in this hall. There are no plans for a new carpentry machine: "As we only need studs cut at right angles for timber frame and flat roof elements, we are therefore ideally positioned. We get

Think bigger

Table four moves transversely. On this table, the second element side is closed and then secured, cut, and equipped with the desired openings by the WALLTEQ M-380. All work on the wood frame elements is [...] elements has reduced drastically compared to manual production," explains Tillmann Schütt. "The cutting pattern is better and the precision and accuracy of fit of the elements have increased significantly

HOMAG Treff 2022 in Holzbronn: Together again

production could look like with the SAWTEQ solution. The production preview is optimized for automatic cutting or for maximum performance. This means that HOMAG is creating transparency about production times

Subissati increases capacity at its company site

Depending on the wall type, a further internal planking layer may also be attached to the OSB panel. The cut-outs for electrical wires and pipes are created in this layer. The element is then turned. The entire

How will prefabricated houses be produced in the future?

flow and cycle time optimization, it gives me all the options for connecting systems, such as panel cutting. Breaking down these various islands was very important for our future expansion." "Batch size 1

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.