Skip to content

Search results

Searched for "case". Found 346 results in 16 milliseconds.

Displaying results 331 to 340 of 346.

Stepping up the pace of production

truck than we could on cutting. So we were keen to improve performance in storage and sawing." In this case, improving performance meant installing automatic panel storage for stacking 600 to 1000 panels, improving

Courage brings its own reward

system and one measuring probe for part measurement and processing dimension correction (e.g. in the case of pre-sized components). Bosch uses the DRIVE 5+ 5-axis head predominantly for the positioning axis

The WEINMANN multifunction bridge- optimizing working conditions

lose sight of profitability. Carpentry business with a solid construction department This was the case at Johann Lechner GmbH in Buchbach in Bavaria, Germany. In October 2019, the company put a WALLTEQ

Taking Industry 4.0 to the next level: Accelerating digitalisation in the Asian market

Center in real time using wireless video diagnostics. It can provide a simple overview of all service cases and maintenance status, and allows users to directly contact the respective service partners for swift

Five steps to more effectiveness

used both as an "ad hoc" measure and to mark the start of a continuous optimisation process. In both cases, production is analysed individually as a whole. In our experience, companies that are committed to

The charm of serial construction

This is also the case in the "Auf dem Rode" construction area, where the company has built 18 detached houses in standardized construction. In doing so, the company took advantage of the benefits of serial

Across the north with a wide range of services

construction The North German people are generally seen as rather cold and direct, but this is not the case with the Papcke family at all. During the first telephone call, there was an extremely cheerful "Good

MOD21 – Making modular construction efficient

the material itself: the use of wood significantly reduces the 2e footprint of a building. “In the case of Reutlingen, this resulted in a CO2e reduction of 96%, and in a school project in Berlin-Straußberg

German-Polish module

in width and 3.20 m height clearance, which are also suitable from a transport standpoint. In the case of special requests, the modules can be combined vertically and horizontally, so that large classrooms

Future-oriented solutions for carpenters/joiners in all performance classes of edge banding machines

e advantages for both woodworking shops and small and medium-sized businesses — especially in the case of frequently changing edge thicknesses. The two-profile technology —here with profiles R1 and R2—on

 

Searching for spare parts?

Spare parts can be found in our HOMAG eShop.